Subject: Rate Schedule 1

Description:
Residential, Seasonal and Small Commercial

Date Approved:
April 23, 2007

Availability:
Available to the members of Northern Lights, Inc. for
all general use, subject to its Member Service Policies.

Type of Service: Single phase or multi-phase, at available voltages. All installations requiring over 100 KVA of transformer capacity for motor type loads are ineligible for this schedule but will be billed on Schedule No. 2 or No. 3.

Rate Schedule:

Basic Charge: Single Phase $ 25.00 | Multi Phase $ 28.00

Energy Charge: 0-1250 kwh $ 0.0573 | over 1250 kwh $ 0.0716

Power Cost Adjustment: Per kilowatt hour $ 0.0000


Other Information: Each Member who has installed service, whether energized or not, will be liable for the above described basic charge.
A penalty charge of $5.00 or 1%, whichever is greater, will be charged on any balances left on your bill after the 23rd of each month.

Adopted by the Board of Directors at the April 23, 2007 Board Meeting, to be effective on the scheduled billing of June 28, 2007.

 


Subject: Rate Schedule 1A

Description: Pumping - Domestic

Date Approved: June 25, 2007

Availability: Available to the members of Northern Lights, Inc. for separately metered domestic water and/or sewer pumping and water or sewer districts, subject to its member Service Policies. All installations consuming more than 100 kwh per month are ineligible for this schedule. To be eligible for this rate, the members must also have an account being billed under Schedule #1.

Type of Service: Single phase at available voltages.

Rate Schedule:

Basic Charge: Single Phase $ 14.75

Energy Charge: 0-100 $ 0.0977

Power Cost Adjustment: Per kilowatt hour $ 0.0


Other Information: Each Member who has installed service, whether energized or not, will be liable for the above described basic charge.
A penalty charge of $5.00 or 1%, whichever is greater, will be charged on any balances left on your bill after the 23rd of each month.

Adopted by the Board of Directors at the June 25, 2007 Board Meeting, to be effective after the scheduled billing of October 26, 2007.
 


Subject: Rate Schedule 2

Description: Large Commercial - Secondary

Date Approved: April 23, 2007

Availability: Available to the members of Northern Lights, Inc. for Large Power use, subject to its Member Service Policies. Service shall be provided and metered at Secondary Voltages.

Type of Service: Three phase, 60 cycle, at standard voltages. Consumers receiving service under this schedule requiring over 300 KVA of transformer capacity may take delivery of electric power at Primary Voltage, in which case they will provide all transformers and be billed on Schedule #3.

Rate Schedule:

Basic Charge: Three Phase $ 50.00

Energy Charge: All kwh $ 0.0503

Demand Charge: Per KVA $ 5.50

Power Cost Adjustment: Per kilowatt hour $ 0.0000

Minimum Monthly Billing:
The minimum monthly charge shall be the HIGHEST one of the following charges, determined for the customer in question:

1. The sum of the Basic, Demand and Energy charges or
2. The Minimum Monthly Charge specified in a contract for service or
3. A charge of $ 0.75 per KVA of required transformer capacity.


Other Information: Each Member who has installed service, whether energized or not, will be liable for the above described basic charge.

A penalty charge of $5.00 or 1%, whichever is
greater, will be charged on any balances left on your
bill after the 23rd of each month.

Adopted by the Board of Directors at the April 23, 2007 Board Meeting, to be effective on the scheduled billing of June 28, 2007.
 


Subject: Rate Schedule 3

Description: Large Power - Primary

Date Approved: April 23, 2007

Availability: Available to the members of Northern Lights, Inc. for Large Power use, subject to its Member Service Policies. Service shall be provided and metered at Primary Voltages.

Type of Service: Three phase, 60 cycle, at standard available voltages. Consumers receiving service under this schedule will provide all transformers and take service at 300 KVA or greater. Northern Lights, Inc. will meter accounts under this rate schedule at primary voltages or at secondary voltages by mutual agreement.

Rate Schedule:

Basic Charge: Three Phase $ 80.00

Energy Charge: All kwh $ 0.0403

Demand Charge: Per KVA $ 5.25

Power Cost Adjustment: Per kilowatt hour $ 0.0000

Minimum Monthly Billing:

The minimum monthly charge shall be the HIGHEST one of the following charges,
determined for the customer in question:

1. The sum of the Basic, Demand and Energy charges or
2. The Minimum Monthly Charge specified in a contract for service or
3. A charge of $ 0.75 per KVA of required transformer capacity.

Determination of Billing Demand


The billing demand shall normally be the maximum kilovoltampere (KVA) load used by the consumer, as indicated or recorded by a demand meter.

Power Factor

The consumer agrees to maintain, as near as practical, unity power factor.
Other Information:

Each Member who has installed service, whether energized or not, will be liable for the above described basic charge.
A penalty charge of $5.00 or 1%, whichever is greater, will be charged on any balances left on your bill after the 23rd of each month.

Adopted by the Board of Directors at the April 23, 2007 Board Meeting, to be effective on the scheduled billing of June 28, 2007.
 


Subject: Rate Schedule 4

Description: Irrigation

Date Approved: June 25, 2007

Availability: Available to the members of Northern Lights, Inc. for Irrigation use of 5 horsepower or more, subject to its Member Service Policies.

Type of Service: Multi phase or single phase, 60 cycle, at available secondary voltages.

Rate Schedule:

Annual Basic Charge: Per HP $ 24.00

Energy Charge: Between Mar & Nov Billings $ 0.033 | Between Nov and Mar Billings $ 0.0707

Power Cost Adj Per kilowatt hour $ 0.000


Other Information: Each Member who has installed service, whether energized or not, will be liable for the above described basic charge.
A penalty charge of $5.00 or 1%, whichever is greater, will be charged on any balances left on your bill after the 23rd of each month.
If the irrigation service is not energized, the annual basic charge will be $7.00 per horsepower.

The annual basic charge of $7.00 per horsepower will be billed with the regular March billing (approximately March 23rd), and must be paid prior to connection of the service each year.

The remaining $17.00 per horsepower, if the service was used, and the energy usage will be billed with the regular November billing (approximately November 23rd) each year.

Adopted by the Board of Directors at the June 25, 2007 Board Meeting, to be effective after the scheduled billing of November 28, 2007.
 


Subject: Rate Schedule 5

Description: Drainage

Date Approved: June 25, 2007

Availability: Available to the members of Northern Lights, Inc. for
drainage use, subject to its Member Service Policies.

Type of Service: Multi phase or single phase, 60 cycle, at available voltages.


Rate Schedule:

Basic Charge $ 25.00/mo

Energy Charge: All kwh $ 0.0551

Demand Charge: Per KVA $ 5.25

Power Cost Adjustment Per kilowatt hour $ 0.0000


Determination of Demand:

The billing demand shall normally be the maximum kilovolt ampere (KVA) load used by the consumer, as indicated or recorded by a demand meter.


Other Information: A penalty charge of $5.00 or 1%, whichever is greater, will be charged on any balances left on your bill after the 23rd of each month.

Any installation on which the basic charge is not paid shall be subject to retirement at the option of Northern Lights, Inc.

Adopted by the Board of Directors at the June 25, 2007 Board Meeting, to be effective after the scheduled billing of October 25, 2007.
 


Subject: Rate Schedule 6

Description: Lighting Service

Date Approved: July 23, 2007

Availability: Available to the members of Northern Lights, Inc. for lighting service, subject to its Member Service Policies.

Type of Service: Service will be supplied to members for dusk-to-dawn lighting on a Three Year Minimum Contract for controlled yard and street lighting service.

Rate Schedule:

Monthly Charge: 100W $ 16.99/mo | 200W $ 29.03/mo

Annual Charge: 100W Annual $ 183.49/yr | 200W Annual $ 313.52/yr


Other Information: A penalty charge of $5.00 or 1%, whichever is greater, will be charged on any balances left on your bill after the 23rd of each month.

Adopted by the Board of Directors at the July 23, 2007 Board Meeting, to be effective after the scheduled billing of October 25, 2007.
 


Subject: Rate Schedule 7

Description: Lighting Service within the City Limits of Sandpoint

Date Approved: March 14, 2005

Availability: Available to the members of Northern Lights, Inc. for lighting service, subject to its Member Service Policies.

Type of Service: Service will be supplied to members for dusk-to-dawn lighting for controlled yard and street lighting service.

Rate Schedule:

Company-owned pole and lights maintained by Northern Lights:

100 Watt High Pressure Sodium Light $16.99 per month
200 Watt High Pressure Sodium Light $29.03 per month

Service subject to three-year contract.

Customer owned and maintained lighting service:

Basic Monthly Service Charge: $ 6.00

Energy Costs: 0-1250 kWh $ 0.0573
> 1250 kWh $ 0.0716

Power Cost Adjustment: Applies to all kWh $ 0.0000

All services subject to 1% franchise fee for City of Sandpoint.

Other Information: A penalty charge of $5.00 or 1%, whichever is greater, will be charged on any balances left on your bill after the 23rd of each month.

Adopted by the Board of Directors at the July 23, 2007 Board Meeting, to be effective after the scheduled billing of October 25, 2007.
 


Subject: Rate Schedule 8

Description: Mountain Top Rates

Date Approved: April 23, 2007

Availability: Available to the members of Northern Lights, Inc. for general use, subject to its Member Service Policies.

Type of Service: Single phase or multi-phase, at available voltages. All installations requiring over 100 KVA of transformer capacity for motor type loads are ineligible for this schedule, but will be billed on Schedule #2 or #3.

Rate Schedule:

Basic Charge: Single Phase $ 62.50

Energy Charge: 0-1250 KWH’s $ 0.0573
1250 + KWH’s $ 0.0716

Power Cost Adjustment: Per kilowatt hour $ 0.0000


Other Information: Each Member who has installed service, whether energized or not, will be liable for the above described basic charge.

A penalty charge of $5.00 or 1%, whichever is greater, will be charged on any balances left on your bill after the 23rd of each month.

Adopted by the Board of Directors at the April 23, 2007 Board Meeting, to be effective on the scheduled billing of June 28, 2007.
 

  

Home

Email Us

Copyright © 2000 NLI. All rights reserved.
P.O. Box 269 | 421 Chevy St.  Sagle, ID. 83860
(208) 263-5141 | 1-800-326-9594

Web site Designed by, Ken Lenz Design Solutions