
|
|
Subject: Rate Schedule 1
Description: Residential, Seasonal and Small
Commercial
Date Approved: April 23, 2007
Availability: Available to the members of
Northern Lights, Inc. for
all general use, subject to its Member Service
Policies.
Type of Service: Single phase or
multi-phase, at available voltages. All
installations requiring over 100 KVA of
transformer capacity for motor type loads are
ineligible for this schedule but will be billed on
Schedule No. 2 or No. 3.
Rate Schedule:
Basic Charge: Single Phase $ 25.00 | Multi
Phase $ 28.00
Energy Charge: 0-1250 kwh $ 0.0573 | over
1250 kwh $ 0.0716
Power Cost Adjustment: Per kilowatt hour $
0.0000
Other Information: Each Member who has
installed service, whether energized or not, will
be liable for the above described basic charge.
A penalty charge of $5.00 or 1%, whichever is
greater, will be charged on any balances left on
your bill after the 23rd of each month.
Adopted by the Board of Directors at the April 23,
2007 Board Meeting, to be effective on the
scheduled billing of June 28, 2007.
|
|
|
|
Subject: Rate Schedule 1A
Description: Pumping - Domestic
Date Approved: June 25, 2007
Availability: Available to the members of
Northern Lights, Inc. for separately metered domestic
water and/or sewer pumping and water or sewer
districts, subject to its member Service Policies. All
installations consuming more than 100 kwh per month
are ineligible for this schedule. To be eligible for
this rate, the members must also have an account being
billed under Schedule #1.
Type of Service: Single phase at available
voltages.
Rate Schedule:
Basic Charge: Single Phase $ 14.75
Energy Charge: 0-100 $ 0.0977
Power Cost Adjustment: Per kilowatt hour $ 0.0
Other Information: Each Member who has
installed service, whether energized or not, will be
liable for the above described basic charge.
A penalty charge of $5.00 or 1%, whichever is greater,
will be charged on any balances left on your bill
after the 23rd of each month.
Adopted by the Board of Directors at the June 25, 2007
Board Meeting, to be effective after the scheduled
billing of October 26, 2007.
|
|
|
|
Subject: Rate Schedule 2
Description: Large Commercial - Secondary
Date Approved: April 23, 2007
Availability: Available to the members of
Northern Lights, Inc. for Large Power use, subject to
its Member Service Policies. Service shall be provided
and metered at Secondary Voltages.
Type of Service: Three phase, 60 cycle, at
standard voltages. Consumers receiving service under
this schedule requiring over 300 KVA of transformer
capacity may take delivery of electric power at
Primary Voltage, in which case they will provide all
transformers and be billed on Schedule #3.
Rate Schedule:
Basic Charge: Three Phase $ 50.00
Energy Charge: All kwh $ 0.0503
Demand Charge: Per KVA $ 5.50
Power Cost Adjustment: Per kilowatt hour $
0.0000
Minimum Monthly Billing:
The minimum monthly charge shall be the HIGHEST one of
the following charges, determined for the customer in
question:
1. The sum of the Basic, Demand and Energy charges
or
2. The Minimum Monthly Charge specified in a contract
for service or
3. A charge of $ 0.75 per KVA of required transformer
capacity.
Other Information: Each Member who has
installed service, whether energized or not, will be
liable for the above described basic charge.
A penalty charge of $5.00 or 1%, whichever is
greater, will be charged on any balances left on your
bill after the 23rd of each month.
Adopted by the Board of Directors at the April 23,
2007 Board Meeting, to be effective on the scheduled
billing of June 28, 2007.
|
|
|
|
Subject: Rate Schedule 3
Description: Large Power - Primary
Date Approved: April 23, 2007
Availability: Available to the members of
Northern Lights, Inc. for Large Power use, subject to
its Member Service Policies. Service shall be provided
and metered at Primary Voltages.
Type of Service: Three phase, 60 cycle, at
standard available voltages. Consumers receiving
service under this schedule will provide all
transformers and take service at 300 KVA or greater.
Northern Lights, Inc. will meter accounts under this
rate schedule at primary voltages or at secondary
voltages by mutual agreement.
Rate Schedule:
Basic Charge: Three Phase $ 80.00
Energy Charge: All kwh $ 0.0403
Demand Charge: Per KVA $ 5.25
Power Cost Adjustment: Per kilowatt hour $
0.0000
Minimum Monthly Billing:
The minimum monthly charge shall be the HIGHEST one of
the following charges,
determined for the customer in question:
1. The sum of the Basic, Demand and Energy charges
or
2. The Minimum Monthly Charge specified in a contract
for service or
3. A charge of $ 0.75 per KVA of required transformer
capacity.
Determination of Billing Demand
The billing demand shall normally be the maximum
kilovoltampere (KVA) load used by the consumer, as
indicated or recorded by a demand meter.
Power Factor
The consumer agrees to maintain, as near as practical,
unity power factor.
Other Information:
Each Member who has installed service, whether
energized or not, will be liable for the above
described basic charge.
A penalty charge of $5.00 or 1%, whichever is greater,
will be charged on any balances left on your bill
after the 23rd of each month.
Adopted by the Board of Directors at the April 23,
2007 Board Meeting, to be effective on the scheduled
billing of June 28, 2007.
|
|
|
|
Subject: Rate Schedule 4
Description: Irrigation
Date Approved: June 25, 2007
Availability: Available to the members of
Northern Lights, Inc. for Irrigation use of 5
horsepower or more, subject to its Member Service
Policies.
Type of Service: Multi phase or single phase,
60 cycle, at available secondary voltages.
Rate Schedule:
Annual Basic Charge: Per HP $ 24.00
Energy Charge: Between Mar & Nov Billings $
0.033 | Between Nov and Mar Billings $ 0.0707
Power Cost Adj Per kilowatt hour $ 0.000
Other Information: Each Member who has
installed service, whether energized or not, will be
liable for the above described basic charge.
A penalty charge of $5.00 or 1%, whichever is greater,
will be charged on any balances left on your bill
after the 23rd of each month.
If the irrigation service is not energized, the annual
basic charge will be $7.00 per horsepower.
The annual basic charge of $7.00 per horsepower will
be billed with the regular March billing
(approximately March 23rd), and must be paid prior to
connection of the service each year.
The remaining $17.00 per horsepower, if the service
was used, and the energy usage will be billed with the
regular November billing (approximately November 23rd)
each year.
Adopted by the Board of Directors at the June 25, 2007
Board Meeting, to be effective after the scheduled
billing of November 28, 2007.
|
|
|
|
Subject: Rate Schedule 5
Description: Drainage
Date Approved: June 25, 2007
Availability: Available to the members of
Northern Lights, Inc. for
drainage use, subject to its Member Service Policies.
Type of Service: Multi phase or single phase,
60 cycle, at available voltages.
Rate Schedule:
Basic Charge $ 25.00/mo
Energy Charge: All kwh $ 0.0551
Demand Charge: Per KVA $ 5.25
Power Cost Adjustment Per kilowatt hour $ 0.0000
Determination of Demand:
The billing demand shall normally be the maximum
kilovolt ampere (KVA) load used by the consumer, as
indicated or recorded by a demand meter.
Other Information: A penalty charge of $5.00 or
1%, whichever is greater, will be charged on any
balances left on your bill after the 23rd of each
month.
Any installation on which the basic charge is not paid
shall be subject to retirement at the option of
Northern Lights, Inc.
Adopted by the Board of Directors at the June 25, 2007
Board Meeting, to be effective after the scheduled
billing of October 25, 2007.
|
|
|
|
Subject: Rate Schedule 6
Description: Lighting Service
Date Approved: July 23, 2007
Availability: Available to the members of
Northern Lights, Inc. for lighting service, subject to
its Member Service Policies.
Type of Service: Service will be supplied to
members for dusk-to-dawn lighting on a Three Year
Minimum Contract for controlled yard and street
lighting service.
Rate Schedule:
Monthly Charge: 100W $ 16.99/mo | 200W $
29.03/mo
Annual Charge: 100W Annual $ 183.49/yr | 200W
Annual $ 313.52/yr
Other Information: A penalty charge of $5.00 or
1%, whichever is greater, will be charged on any
balances left on your bill after the 23rd of each
month.
Adopted by the Board of Directors at the July 23, 2007
Board Meeting, to be effective after the scheduled
billing of October 25, 2007.
|
|
|
|
Subject: Rate Schedule 7
Description: Lighting Service within the City
Limits of Sandpoint
Date Approved: March 14, 2005
Availability: Available to the members of
Northern Lights, Inc. for lighting service, subject to
its Member Service Policies.
Type of Service: Service will be supplied to
members for dusk-to-dawn lighting for controlled yard
and street lighting service.
Rate Schedule:
Company-owned pole and lights maintained by
Northern Lights:
100 Watt High Pressure Sodium Light $16.99 per month
200 Watt High Pressure Sodium Light $29.03 per month
Service subject to three-year contract.
Customer owned and maintained lighting service:
Basic Monthly Service Charge: $ 6.00
Energy Costs: 0-1250 kWh $ 0.0573
> 1250 kWh $ 0.0716
Power Cost Adjustment: Applies to all kWh $ 0.0000
All services subject to 1% franchise fee for City of
Sandpoint.
Other Information: A penalty charge of $5.00 or
1%, whichever is greater, will be charged on any
balances left on your bill after the 23rd of each
month.
Adopted by the Board of Directors at the July 23, 2007
Board Meeting, to be effective after the scheduled
billing of October 25, 2007.
|
|
|
|
Subject: Rate Schedule 8
Description: Mountain Top Rates
Date Approved: April 23, 2007
Availability: Available to the members of
Northern Lights, Inc. for general use, subject to its
Member Service Policies.
Type of Service: Single phase or multi-phase,
at available voltages. All installations requiring
over 100 KVA of transformer capacity for motor type
loads are ineligible for this schedule, but will be
billed on Schedule #2 or #3.
Rate Schedule:
Basic Charge: Single Phase $ 62.50
Energy Charge: 0-1250 KWH’s $ 0.0573
1250 + KWH’s $ 0.0716
Power Cost Adjustment: Per kilowatt hour $
0.0000
Other Information: Each Member who has
installed service, whether energized or not, will be
liable for the above described basic charge.
A penalty charge of $5.00 or 1%, whichever is greater,
will be charged on any balances left on your bill
after the 23rd of each month.
Adopted by the Board of Directors at the April 23,
2007 Board Meeting, to be effective on the scheduled
billing of June 28, 2007.
|
|
|
|
Copyright © 2000 NLI.
All rights reserved.
P.O. Box 269 | 421 Chevy St. Sagle, ID. 83860
(208) 263-5141 | 1-800-326-9594
Web site Designed by,
Ken Lenz Design Solutions |
 |
 |